感兴趣?立即联系我们
请填写右侧表单或直接通过以下邮箱与我们联系
sales@senecaesg.com
The Indian government has extended the mandate for power producers to import 6% of their coal requirements until June due to transport constraints and increased electricity demand, as reported by Reuters on March 5. Despite sufficient domestic availability and record coal production by Coal India, issues with the railway network have necessitated imports. The Ministry of Power anticipates peak power demand to reach up to 250 GW in summer 2024, a 3% increase from the previous year’s record. Coal remains the dominant source, constituting about 75% of India’s power generation, with coal-fired plants being the primary users.
Sources:
监控投资组合中的ESG表现,创建自己的ESG框架,并做出更明智的商业决策。
请填写右侧表单或直接通过以下邮箱与我们联系
sales@senecaesg.com7 Straits View, Marina One East Tower, #05-01, Singapore 018936
+(65) 6223 8888
Carrer de la Tapineria, 10
Ciutat Vella, 08002, Barcelona, Spain
+34 612 22 79 06
77 Dunhua South Road, 7F Section 2, Da'an District Taipei City, Taiwan 106414
(+886) 02 2706 2108
Av. Santo Toribio 143,
San Isidro, Lima, Peru, 15073
(+51) 951 722 377