German to Provide USD17bn in Subsidies for Hydrogen-Ready Gas-Fired Power Plants

German to Provide USD17bn in Subsidies for Hydrogen-Ready Gas-Fired Power Plants

BY  
Jordy Leo  
- February 7, 2024

The German government has agreed to a EUR16bn (USD17bn) plan to subsidize gas power plants that can switch to hydrogen, as reported by Reuters on February 5. According to people familiar with the matter, the government would spend around USD17bn to support companies in constructing and operating hydrogen-ready gas power plants, including capital and operating subsidies. The developers are required to upgrade plants to burn hydrogen sometime between 2035 and 2040, while leaving open room for carbon capturing and storage technologies. The exact timeline for these gas plants to switch to hydrogen will be decided by the government in 2032, without specifying that the this must be green hydrogen produced from renewable sources.

The subsidy plan still needs approval from the European Commission, which previously raised expressed concerns about an expansion of fossil fuels. However, the expansion of gas-fired power plants seems a necessary choice to Germany, especially as the country looks to bring forward its coal phase-out plan by eight years to 2030 amid a growing power demand. In addition, the country’s shuttering of its remaining nuclear reactors last year also makes gas power plants crucial. Aside from the financial support for hydrogen-ready gas power plants, the government has also proposed measures to simplify the fiscal and planning processes for green hydrogen facilities, aiming to secure a local supply for power producers. However, critics including domestic environmental groups argue that the gas plan may prolong the country’s reliance on fossil natural gas, impeding the efforts to achieve climate neutrality.

S****ources:

https://www.reuters.com/business/energy/germany-agrees-subsidy-plans-hydrogen-ready-gas-power-plants-2024-02-05/

https://www.bloomberg.com/news/articles/2024-02-05/germany-paves-way-for-major-expansion-of-gas-fired-power-plants

https://www.power-technology.com/news/germany-e16bn-hydrogen-power-plants/?cf-view

立即開始使用 Seneca ESG 工具包

監控投資組合 ESG 表現,自建 ESG 框架,讓商業決策更精準。

Toolkit

Seneca ESG

有興趣?立即聯絡我們

請填寫右側表單,或直接郵件聯絡我們:

sales@senecaesg.com

新加坡辦公室

7 Straits View, Marina One East Tower, #05-01, Singapore 018936

+(65) 6223 8888

巴塞隆拿辦公室

Carrer de la Tapineria, 10

Ciutat Vella, 08002, Barcelona, Spain

+34 612 22 79 06

台北辦公室

台灣台北市大安區敦化南路二段77號7樓,106414

(+886) 02 2706 2108

利馬辦公室

Av. Santo Toribio 143,

San Isidro, Lima, Peru, 15073

(+51) 951 722 377