German Tenders 10 GW of Gas-Fired Power Stations Ready for Hydrogen

German Tenders 10 GW of Gas-Fired Power Stations Ready for Hydrogen

BY  
Jordy Leo  
- March 6, 2024

The German government has announced its intention to tender for 10 gigawatts (GW) of new gas-fired power station capacity, with a requirement for these plants to be capable of transitioning to clean hydrogen in the future, as reported by Reuters on March 5. This move is part of the country’s broader strategy to shift away from polluting fossil fuels towards more sustainable energy sources. In response, utilities are gearing up to bid for subsidies to cover investment costs, as these gas-fired plants are seen as essential for complementing renewable energy sources during periods of low supply.

Various companies, including IQONY, Uniper , EnBW , LEAG, RWE , Statkraft, and KMW, have expressed interest in participating in the tender or have outlined their plans for hydrogen-ready gas-fired plants. Uniper’s CEO has highlighted the potential of the plan but suggests that a larger scale, around 20-25 GW of new capacity, would be necessary for a significant departure from coal. These developments underscore the industry’s recognition of the importance of transitioning towards cleaner energy sources while ensuring energy security and stability in the grid.

Sources:

https://www.reuters.com/business/energy/german-utilities-bid-new-power-station-capacity-2024-03-05/

今天就开始使用Seneca ESG工具包

监控投资组合中的ESG表现,创建自己的ESG框架,并做出更明智的商业决策。

Toolkit

Seneca ESG

感兴趣?立即联系我们

请填写右侧表单或直接通过以下邮箱与我们联系

sales@senecaesg.com

新加坡办公室

7 Straits View, Marina One East Tower, #05-01, Singapore 018936

+(65) 6223 8888

巴塞罗那办公室

Carrer de la Tapineria, 10

Ciutat Vella, 08002, Barcelona, Spain

+34 612 22 79 06

台北办公室

77 Dunhua South Road, 7F Section 2, Da'an District Taipei City, Taiwan 106414

(+886) 02 2706 2108

利马办公室

Av. Santo Toribio 143,

San Isidro, Lima, Peru, 15073

(+51) 951 722 377