JFE Steel Plans Major Emission Cut with World's Largest Electric Arc Furnace by 2027

JFE Steel Plans Major Emission Cut with World's Largest Electric Arc Furnace by 2027

BY  
Tracy Liu  
- November 9, 2023

JFE Steel , Japan’s second-largest steelmaker, plans to construct a large-scale electric arc furnace (EAF) by 2027 to replace its No.2 blast furnace in the Kurashiki plant, aiming to reduce carbon dioxide (CO2) emissions, as reported by Reuters on November 8. Steelmaking, known for its high CO2 emissions, is under pressure to address climate change concerns. JFE aims to lower emissions by 30% compared to 2013 levels by 2030.

The new EAF, potentially one of the world’s largest, is expected to produce 2 million metric tons of high-grade steel annually and cut CO2 emissions by 2.6 million tons per year. To achieve this, JFE plans to import low-carbon steel-making raw material, “reduced iron,” from the United Arab Emirates, created using natural gas and carbon capture storage. This initiative aims to establish a large-scale supply system for green high-grade steel, comparable to the traditional blast furnace method. Additionally, JFE is exploring cleaner steelmaking methods, including hydrogen and methanation, but sees EAF as a feasible and rapid solution for emission reduction during the transition period.

Sources:

https://www.reuters.com/sustainability/climate-energy/jfe-aims-build-electric-arc-furnace-2027-replace-blast-furnace-2023-11-08/

今天就开始使用Seneca ESG工具包

监控投资组合中的ESG表现,创建自己的ESG框架,并做出更明智的商业决策。

Toolkit

Seneca ESG

感兴趣?立即联系我们

请填写右侧表单或直接通过以下邮箱与我们联系

sales@senecaesg.com

新加坡办公室

7 Straits View, Marina One East Tower, #05-01, Singapore 018936

+(65) 6223 8888

巴塞罗那办公室

Carrer de la Tapineria, 10

Ciutat Vella, 08002, Barcelona, Spain

+34 612 22 79 06

台北办公室

77 Dunhua South Road, 7F Section 2, Da'an District Taipei City, Taiwan 106414

(+886) 02 2706 2108

利马办公室

Av. Santo Toribio 143,

San Isidro, Lima, Peru, 15073

(+51) 951 722 377