Mitsubishi, Mitsui Participate in Australian Carbon Capture and Storage Project

Mitsubishi, Mitsui Participate in Australian Carbon Capture and Storage Project

BY  
Seneca ESG  
- February 8, 2022

Japan’s Mitsubishi and Mitsui will team up for a carbon capture and storage (CCS) project located in the seabed of Western Australia, as reported by Nikkei Asia on February 4. The selected sea area has the highest concentration of offshore gas fields in Australia, and the project is designed to store carbon dioxide (CO2) in the gaps of the seabed where natural gas used to be. Operation is expected to commence in 2030 when CO2 generated by local factories will be captured and transferred to the seabed through pipelines. At a later stage, Mitsubishi and Mitsui also plan on transporting their CO2 emissions by sea and storing them in the project. Other participants of the project include Australian energy group Woodside Petroleum and British oil supermajor BP , two leading firms in the field of CCS.

The Australia-based Global CCS Institute reported that the world has 135 CSS projects in development as of 2021, including 27 already in operation and 71 added during the first nine months of last year. These projects have an estimated combined CSS capacity of 150m tons, which is more than doubled from five years ago. However, to achieve net-zero emissions by 2050, the world needs to recover 7.6bn tons of CO2 annually by that year, according to the International Energy Agency (IEA). To align with this target, Japan expects its CSS capacity to reach 240m tons per year, while the cost of excavation alone would be more than USD17bn. To reduce the expenses, Japan aims to catch up with the pioneers in the field of CSS by ramping up CCS participation. In January 2022, Japan signed a memorandum of cooperation (MOC) with Indonesia to jointly develop decarbonization technologies including hydrogen, ammonia, and CCS.

Sources:

https://asia.nikkei.com/Spotlight/Environment/Climate-Change/Mitsubishi-Mitsui-eye-carbon-capture-with-BP-and-Woodside

https://the-japan-news.com/news/article/0008240189

https://www.reuters.com/business/sustainable-business/japan-indonesia-cooperate-hydrogen-ammonia-ccs-2022-01-10/

今天就开始使用Seneca ESG工具包

监控投资组合中的ESG表现,创建自己的ESG框架,并做出更明智的商业决策。

Toolkit

Seneca ESG

感兴趣?立即联系我们

请填写右侧表单或直接通过以下邮箱与我们联系

sales@senecaesg.com

新加坡办公室

7 Straits View, Marina One East Tower, #05-01, Singapore 018936

+(65) 6223 8888

巴塞罗那办公室

Carrer de la Tapineria, 10

Ciutat Vella, 08002, Barcelona, Spain

+34 612 22 79 06

台北办公室

77 Dunhua South Road, 7F Section 2, Da'an District Taipei City, Taiwan 106414

(+886) 02 2706 2108

利马办公室

Av. Santo Toribio 143,

San Isidro, Lima, Peru, 15073

(+51) 951 722 377